Skip to content
Land Rover Series 2a Restoration

Land Rover Series 2a Restoration

My 1965 Land Rover Project

  • Home
  • Articles
  • About this Blog
  • My Project
    • Technical Stuff
    • The Plan
  • Todo -Stuff to finish off
  • Land Rover Series II and IIA Parts
  • Home
  • Bodywork – finally finshed

All posts by PK

Categories

  • April 2026
  • Carburetter
  • December 2025
  • Fuel Pump
  • May 2026
  • Oil Pump and Filter
  • Part 1 – How it all begins
  • Part 10.1 – Tub and Bulkhead Fitting
  • Part 2 – Tear Down
  • Part 3 – Axles
  • Part 4 – Rolling Chassis Build
  • Part 5 – Bodywork
  • Part 6 – Electrics
  • Part 7 – Pedals
  • Part 8 – Gearbox
  • Part 9 – Engine
  • Starter Motor

Recent Posts

  • May 2026 – Various Bits of Stuff
  • May 2026 – Electrics Continued….
  • May 2026 – Side Lights, Indicators and Rear lights
  • April 2026 – Steering Wheel, Prop Shafts, Petrol Tank and Electrics
  • Electrics continued….

Recent Comments

  1. PK on March 2026 – Bulkhead and Tub Fitting
  2. Nick on March 2026 – Bulkhead and Tub Fitting
  3. Nick A on Carburettor Rebuild
  4. PK on Carburettor Rebuild
  5. Nick A on Carburettor Rebuild

Archives

  • May 2026
  • April 2026
  • March 2026
  • January 2026
  • September 2025
  • August 2025
  • July 2025
  • May 2025
  • March 2025
  • February 2025
  • January 2025
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • May 2024
  • April 2024
  • February 2024
  • January 2024
  • September 2023
  • August 2023
  • July 2023

Bodywork – finally finshed

Final work to finish off the bodywork painting.

PK
17/07/2025

Engine re-build – preparation – part 2

Next stage of engine preparation, this time with some colour on the engine.

PK
26/05/2025

Engine Re-build Preperation

Some preparation work for the engine re-build.

PK
18/05/2025

Engine Strip Down – Part 1

Engine Strip down – part 1

PK
16/03/2025

Starter Motor

Quick starter motor refurbish

PK
16/03/2025

Engine Introduction

Change of plan for the Engine

PK
16/03/2025

Finish off the Gearbox

Finishing off the gearbox,

PK
16/03/2025

Main Gearbox re-build

Re-build of the main gearbox

PK
16/02/2025

Main Gearbox Strip Down

Main Gearbox strip down and inspection

PK
03/02/2025

Transfer Box & Front Output Shaft Housing(Part 2 – Rebuild)

Re-assembly of the front output housing, transfer case and speedo case.

PK
01/02/2025

Posts pagination

1 2 3 4 … 6
  • April 2026
  • Carburetter
  • December 2025
  • Fuel Pump
  • May 2026
  • Oil Pump and Filter
  • Part 1 – How it all begins
  • Part 10.1 – Tub and Bulkhead Fitting
  • Part 2 – Tear Down
  • Part 3 – Axles
  • Part 4 – Rolling Chassis Build
  • Part 5 – Bodywork
  • Part 6 – Electrics
  • Part 7 – Pedals
  • Part 8 – Gearbox
  • Part 9 – Engine
  • Starter Motor
All images and content copyright of Paul 2023, except where credited.