Electrics continued…. Beulkhead electrics fitted. and started looking at the wiring loom. PK 06/04/2026
March 2026 – Bulkhead and Tub Fitting Tub and Bulkhead fitting and alignment plus some bits and pieces. PK 22/03/2026
Engine Rebuild – Fuel Pump, Oil filler, Head and Rocker Some more Engine assembly, nearly there ready to put in the chassis. PK 25/08/2025
Engine rebuild – Oil Pump, Front cover and Water Pump and Sump Added a few parts to the engine, including Oil Pump, Sump, front Cover and Water Pump, Rear Camshaft cover and test fitted thee engine mounts. PK 11/08/2025