If the plan doesn’t work, change the plan, not the goal

This is not meant to be a complete Todo, rather a overview of the major steps I think will be needed.
-
Strip Down
Strip down to Chassis, remove all bolts, fixings & fittings.Stop before engine removed, see if we can get it started. Asses chassis, Bulkhead and other major components and make a decision on repair or replacement.
-
Running Gear
Strip & Service Axles, Springs, Hubs, brake’s
-
Engine
Re-build engine and components
-
Gearbox, Transfer & Clutch
Re-build gearbox, transfer, clutch and Handbrake.
-
Electrics
Buy or Build new loom, install with accessories.
-
Bodywork and Trim
Strip, repair/replace panels, paint or re-finish trim.
-
Re-assemble
Put it all back together
-
Enjoy & Have Some Fun
br>On or Before 25th November 2025
This is the Goal, get it on the road and enjoy it.